Kuna data center
Data center project in Kuna, Idaho
Kuna data center is a data center project in Kuna, Idaho, under construction, developed by Meta, with a stated size of 152 MW. Last reported October 11, 2026, from 10 sources.
- Status
- Under construction
- Developer
- Meta
- Location
- Kuna, Idaho
- Stated size
- 152 MW
- Stated investment
- $800M
- Last reported
- ·
- Sources
- 10 sources
- Other companies on the job
- 7 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
EPA air permits
1 air facility, 1 operating
Equipment on record: diesel engines (generators).
- EPA record ↗ · Operating ·
Permits and filings
- Site planSite plan · City of Kuna Planning & Zoning Commission · kunacity.id.gov ↗
- Original data center site plan approvalZoning · City of Kuna · kunacity.id.gov ↗
- Project Peregrine negotiations (no public hearing required)Public record · Status not stated · globaldatacenters.net ↗
- New water treatment facility for the cityWater · City of Kuna · Status not stated · globaldatacenters.net ↗
- Utility filingUtility filing · Status not stated · globaldatacenters.net ↗
What the sources say
Reported
“Meta Kuna Under construction”
Status
“Stage today - Under construction”
Size
“Epoch AI estimates ~152 MW.”
Investment
“Yip didn't say how much of the $800 million total capital investment went toward construction costs”
Address
601 Kuna Mora Rd, Kuna, ID 83634
Square footage
more than 750,000 square feet
Initial building square footage
960,000 square foot building
Power
152 MW
Cooling
closed-loop cooling system
Construction start
2022
Completion
September 2026
Construction jobs
about 1,200 construction posts
Permanent jobs
about 100 permanent ones
Site plan amendment buildings
2 buildings of 135,000 square feet
Reports behind this page
- Report from aigridwatch.com · aigridwatch.com ·
- Report from constructionowners.com · constructionowners.com ·
- Report from production1.constructionequipmentguide.com · production1.constructionequipmentguide.com ·
What the full file adds
- General contractor2 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply2 named
- Tenant1 named
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners7 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom11 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Kuna and Idaho
- Gemstone Technology ParkApprovedSame town · KunaDiode VenturesSize not stated
- Blacks CreekUnder construction · Town not statedrPlus Energies400 MW
- ValorC3 Boise 2Under construction · BoiseValorC3 Data Centers10 MW
- ValorC3 Boise data center on Emerald StreetUnder construction · BoiseValorC3 Data Centers10 MW
- ValorC3 Boise Data Center CampusUnder construction · BoiseValorC3Size not stated
- ValorC3 Boise greenfield data center projectUnder construction · BoiseValorC3 Data CentersSize not stated
Get every active project in Idaho.
Tell us what you sell. You get the approved and under-construction projects in Idaho and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.