Skip to content

Imperial Data Center

Data center project in California

Imperial Data Center is a data center project in California, blocked or paused, developed by Imperial Valley Computer Manufacturing, LLC. Last reported June 23, 2026, from 6 sources.

Status
Blocked or paused
Developer
Imperial Valley Computer Manufacturing, LLC
Location
California
Stated size
Not stated
Last reported
June 23, 2026
Sources
6 sources
Other companies on the job
1 company named, on Ultra
Public records

Is it moving?

No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.

What the sources say

  • Status

    “Last week, that progress came to a halt when the county board walked back its decision, declaring a 45-day moratorium on data centers and forming a public commission to advise”

    calmatters.org, June 22, 2026 ↗

  • Status

    “Last week, that progress came to a halt when the county board walked back its decision, declaring a 45-day moratorium on data centers”

    usnews.com, June 22, 2026 ↗

  • Status

    “the county board walked back its decision, declaring a 45-day moratorium on data centers”

    mavensnotebook.com, June 22, 2026 ↗

Reports behind this page

  1. Local Leaders Challenge Planned Biggest Data Center In California · m.sej.org, June 23, 2026
  2. This rural, California county approved a massive new data center. Then it changed its mind. · calmatters.org, June 22, 2026
  3. Locals Are Challenging a Million-Square-Foot Data Center That Would Be the Biggest in California - Locals Are Challenging a Million-Square-Foot Data Center That Would Be the Biggest in California · usnews.com, June 22, 2026
  4. CAL MATTERS: This million-square-foot data center would be the biggest in the state. How local leaders are challenging it. · mavensnotebook.com, June 22, 2026
  5. This million-square-foot data center would be the biggest in the state. How local leaders are challenging it. · livermorevine.com, June 22, 2026
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply1 named
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in California

Every data center project in California →
Free sample

Get every active project in California.

Tell us what you sell. You get the approved and under-construction projects in California and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.