Microsoft data center project at LogistiCenter at Copperwing
Data center project in El Mirage, Arizona
Microsoft data center project at LogistiCenter at Copperwing is a data center project in El Mirage, Arizona, announced, developed by Microsoft. Last reported October 18, 2026, from 1 source.
- Status
- Announced
- Developer
- Microsoft
- Location
- El Mirage, Arizona
- Stated size
- Not stated
- Last reported
- ·
- Sources
- 1 source
- Other companies on the job
- None named yet
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
FAA crane filings
1 filing
Latest work from November 16, 2026 to March 15, 2027, up to 200 feet.
- Mobile crane 2026-AWP-17498-OE ↗ · work November 16, 2026 to March 15, 2027 ·
1 builder named on the filings, on Ultra.
What the sources say
Reported
“Microsoft paid $258 million for 283 acres in the park for two buildings totaling 750,000 square feet of space”
Status
“In June 2024, Microsoft paid $258 million for 283 acres in the park for two buildings totaling 750,000 square feet of space”
Reports behind this page
- California data center contractor snags more Valley industrial space · orionprop.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partnersEvery company the sources name on this job as they are found, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in El Mirage and Arizona
- Compass Datacenters project at LogistiCenter at CopperwingAnnouncedSame town · El MirageCompass DatacentersSize not stated
- PHX01Under construction · AvondalePrime Data Centers240 MW
- Meta data center campus in MesaUnder construction · MesaMetaSize not stated
- PHX A7Under construction · GoodyearStream Data CentersSize not stated
- Project EagleApproved · GlendaleTakanock LLCSize not stated
- SpaceX data center campus near Willcox PlayaAnnounced · Town not statedSpaceX6 GW
Get every active project in Arizona.
Tell us what you sell. You get the approved and under-construction projects in Arizona and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.