Belmont
Data center project in Arizona
Belmont is a data center project in Arizona, approved. Last reported December 11, 2025, from 1 source.
- Status
- Approved
- Developer
- Not named in the sources
- Location
- Arizona
- Stated size
- Not stated
- Last reported
- ·
- Sources
- 1 source
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Status
“Last year, 5,000 acres of the Belmont property near Hassayampa Ranch were approved for heavy industrial use by the Board of Supervisors.”
Reports behind this page
- $25B data center planned west of Phoenix wins key approval from county - NewsBreak - 82K · local.newsbreak.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lenders1 named
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Who buys the gear, Cooling view, Site and shell timing, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Trades named on each job, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Making the case to the town, Laws and local rules.
- Power and the grid. Waiting on the grid, On-site power plants, Space data centers, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel, CSV and CRM downloads, Team territories, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts, Territory alerts.
Other data centers in Arizona
- Hassayampa Ranch data centerApproved · TonopahArizona Land Consulting1.5 GW
- Project BaccaraApproved · SurpriseTakanock700 MW
- Project Blue Data CenterApproved · TucsonDeveloper not named300 MW
- Menlo Digital data center campus (Ahwatukee)Under construction · PhoenixMenlo Digital257 MW
- EdgeCore data centre, Mesa, ArizonaApproved · MesaEdgeCore Digital Infrastructure250 MW
- PHX01Under construction · AvondalePrime Data Centers240 MW
Get every active project in Arizona.
Tell us what you sell. You get the approved and under-construction projects in Arizona and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.