Delta Forge 2 AI Factory
Data center project in Brookwood, Alabama
Delta Forge 2 AI Factory is a data center project in Brookwood, Alabama, announced, developed by Applied Digital Corp., with a stated size of 210 MW. Last reported September 24, 2026, from 3 sources.
- Status
- Announced
- Developer
- Applied Digital Corp.
- Location
- Brookwood, Alabama
- Stated size
- 210 MW
- Stated investment
- $3.2B
- Last reported
- September 24, 2026
- Sources
- 3 sources
- Other companies on the job
- 2 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“The '''Delta Forge 2 AI Factory''', previously referred to as '''Project Highlands''', is a planned $3.2 billion, 210 megawatt, 1,260,000 square-foot data center”
Status
“is a planned $3.2 billion, 210 megawatt, 1,260,000 square-foot data center”
Size
“a planned $3.2 billion, 210 megawatt, 1,260,000 square-foot data center”
Reported
“The Delta Forge 2 AI Factory, previously referred to as Project Highlands, is a planned $3.2 billion, 210 megawatt, 1,260,000 square-foot data center for a 160-acre site at Brookwood Parkway”
Reported
“The Delta Forge 2 AI Factory, previously referred to as Project Highlands, is a planned $3.2 billion, 210 megawatt, 1,260,000 square-foot data center”
Reports behind this page
- Delta Forge 2 AI Factory: Difference between revisions · bhamwiki.com, September 24, 2026
- Delta Forge 2 AI Factory: Difference between revisions · bhamwiki.com, September 24, 2026
- Delta Forge 2 AI Factory · bhamwiki.com, September 24, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- Tenant2 named
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom2 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Brookwood and Alabama
- Delta Forge 2Under constructionSame townBrookwoodApplied Digital210 MW
- Delta Forge 2 AI data centerUnder constructionSame townBrookwoodApplied Digital210 MW
- Bessemer Hyperscale Data CenterApprovedBessemerQTS Data Centers1.2 GW
- Nebius Birmingham AI FactoryUnder constructionBirminghamNebius300 MW
- Meta Platforms MontgomeryUnder constructionMontgomeryMeta153 MW
- Digi Power X Alabama AI data centerUnder constructionColumbianaDigi Power X Inc.40 MW
Get every active project in Alabama.
Tell us what you sell. You get the approved and under-construction projects in Alabama and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.