EHRM Tier Two Infrastructure Upgrades At Fargo VAMC
Data center project in Fargo, North Dakota
EHRM Tier Two Infrastructure Upgrades At Fargo VAMC is a data center project in Fargo, North Dakota. Last reported July 6, 2026, from 1 source.
- Status
- Unknown
- Developer
- Not named in the sources
- Location
- Fargo, North Dakota
- Stated size
- Not stated
- Stated investment
- $13.8M
- Last reported
- July 6, 2026
- Sources
- 1 source
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“EHRM tier two infrastructure upgrades at fargo VAMC - project 437-21-210 fargo, ND.”
Investment
“worth up to $13,841,359”
Reports behind this page
- EHRM Tier Two Infrastructure Upgrades At Fargo VAMC (36C77625C0068) · govalpha.com, July 6, 2026
What the full file adds
- General contractor1 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Fargo and North Dakota
- Applied Digital data centerUnder constructionSame townFargoApplied Digital280 MW
- Agassiz Transmission Line and SubstationApprovedSame townFargoMinnkota Power Cooperative280 MW
- Applied Digital Polaris Forge 1 - Ellendale AI FactoryUnder constructionEllendaleApplied Digital400 MW
- Polaris Forge 1Under constructionEllendaleApplied Digital400 MW
- Polaris Forge 1 expansionUnder constructionEllendaleApplied Digital300 MW
- Polaris Forge 2Under constructionHarwoodApplied Digital280 MW
Get every active project in North Dakota.
Tell us what you sell. You get the approved and under-construction projects in North Dakota and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.