Skip to content

Basin Electric / NextEra Energy Data Center

Data center project in Bismarck, North Dakota

Basin Electric / NextEra Energy Data Center is a data center project in Bismarck, North Dakota, approved. Last reported August 25, 2026, from 1 source.

Status
Approved
Developer
Not named in the sources
Location
Bismarck, North Dakota
Stated size
Not stated
Last reported
August 25, 2026
Sources
1 source
Other companies on the job
2 companies named, on Ultra
Public records

Is it moving?

No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.

What the sources say

  • Reported

    “Recommendation of approval of data center ordinance Section 101-11-12 as amended (Basin Electric / NextEra Energy), Highway 31, two miles south of Highway 200, between Hayes and Center, Mercer County,”

    zonewire.co, August 25, 2026 ↗

  • Status

    “Approved as of the August 24, 2026 hearing in Bismarck, ND; 7 hearings tracked.”

    zonewire.co, August 25, 2026 ↗

Reports behind this page

  1. Basin Electric / NextEra Energy Data Center Projects | ZoneWire · zonewire.co, August 25, 2026
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

Other data centers in North Dakota

Every data center project in North Dakota →
Free sample

Get every active project in North Dakota.

Tell us what you sell. You get the approved and under-construction projects in North Dakota and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.