Patmos data center at 2500 Little Blue Parkway
Data center project in Independence, Missouri
Patmos data center at 2500 Little Blue Parkway is a data center project in Independence, Missouri, announced, developed by Patmos, with a stated size of 18 MW. Last reported June 25, 2026, from 1 source.
- Status
- Announced
- Developer
- Patmos
- Location
- Independence, Missouri
- Stated size
- 18 MW
- Stated investment
- $107M
- Last reported
- June 25, 2026
- Sources
- 1 source
- Other companies on the job
- 5 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Investment
“The planned Patmos data center is projected to cost about $107 million to construct, according to a commercial building permit application.”
Reports behind this page
- Report from aol.com · aol.com, June 25, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractor1 named
- Mechanical contractor1 named
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply2 named
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners5 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Independence and Missouri
- Nebius data centerUnder constructionSame townIndependenceNebius Group, N.V.1.2 GW
- Festus Data Center CampusApprovedFestusCRG600 MW
- KNC Confidential Data CenterUnder constructionKansas CityDeveloper not named80 MW
- Patmos AI CampusUnder constructionKansas CityPatmos Holdings Inc.35 MW
- Amazon data center project outside New FlorenceUnder constructionNew FlorenceAmazonSize not stated
- Golden Plains Technology ParkUnder constructionTown not statedDiode VenturesSize not stated
Get every active project in Missouri.
Tell us what you sell. You get the approved and under-construction projects in Missouri and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.