Project Cannoli
Data center project in Van Buren, Michigan
Project Cannoli is a data center project in Van Buren, Michigan, approved, developed by Panattoni, with a stated size of 1 GW. Last reported October 21, 2026, from 42 sources.
- Status
- Approved
- Developer
- Panattoni
- Location
- Van Buren, Michigan
- Stated size
- 1 GW
- Stated investment
- $2B
- Last reported
- October 21, 2026
- Sources
- 42 sources
- Other companies on the job
- 15 companies named, on Ultra
Is it moving?
Permits and filings
- Preliminary site plan approvalSite plan · Approved · February 11, 2026vbtmi.gov ↗
- Final site plan approvalSite plan · Approvedwemu.org ↗
- Substation and switching station preliminary site planSite plan · Approvedswitchgear-magazine.com ↗
- Utility filingUtility filing · Approvedbridgemi.com ↗
- Wetland permitsEnvironmental review · Approvedbridgemi.com ↗
- $125 million tax breakIncentive · Approvedmichiganpublic.org ↗
- Non-residential PUD zoning ordinance amendmentZoning · Approvedvbtmi.gov ↗
What the sources say
Size
“Reported size: 1000 MW, 282 acres.”
Size
“The facility’s 1-gigawatt of energy demand amounts to the energy equivalent of 750,000 homes.”
Status
“Stage: Planned / Early development”
Size
“Total Capacity: 1 GW”
Acreage
282 acres
Power demand
1 gigawatt
Substation
two 345 kV transmission lines
Cooling
open-loop for one building, closed-loop or forced-air for the other two
Construction start
before the end of 2026
Power draw start
December 2027
Permanent jobs
50 to 200 on-site employees
Construction hours
more than 9 million construction hours
Construction hours on site
6 a.m. to 7 p.m. six to seven days a week
Green space
approximately 130 acres
Reports behind this page
- Report from isadatacentercoming.com · isadatacentercoming.com, October 18, 2026
- Report from themanchestermirror.com · themanchestermirror.com, October 18, 2026
- Report from constructionreviewonline.com · constructionreviewonline.com, March 17, 2026
What the full file adds
- General contractor1 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioning4 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supply4 named
- Tenant1 named
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners15 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom39 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Michigan
- The BarnUnder constructionSaline TownshipRelated Digital1 GW
- Google Van Buren Township Data Center Campus (Project Cannoli)ApprovedVan Buren TownshipGoogleSize not stated
- Stargate Mt. Pleasant areaUnknownMt. PleasantDeveloper not named600 MW
- Switch Pyramid CampusUnknownGaines TownshipSwitch225 MW
- Detroit Stargate siteAnnouncedDetroitOracleSize not stated
- Lyon Township data centerAnnouncedLyon TownshipWalbridge GroupSize not stated
Get every active project in Michigan.
Tell us what you sell. You get the approved and under-construction projects in Michigan and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.