Salt River Project Coolidge Substation and BTM Yard for Phoenix Hyperscale Campus
Data center project in Coolidge, Arizona
Salt River Project Coolidge Substation and BTM Yard for Phoenix Hyperscale Campus is a data center project in Coolidge, Arizona. Last reported October 28, 2026, from 1 source.
- Status
- Unknown
- Developer
- Not named in the sources
- Location
- Coolidge, Arizona
- Stated size
- Not stated
- Stated investment
- $210M
- Last reported
- October 28, 2026
- Sources
- 1 source
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“Salt River Project Coolidge Substation and BTM Yard for Phoenix Hyperscale Campus — Coolidge, AZ · $210,000,000 · target 2025”
Reports behind this page
- Hyperscale Data Center Power Substation + Behind-the-Meter Construction Crew Shuttles — Nationwide Coverage · unlimitedconstructionshuttles.com, October 28, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply1 named
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Arizona
- PHX01Under constructionAvondalePrime Data Centers240 MW
- Meta data center campus in MesaUnder constructionMesaMetaSize not stated
- PHX A7Under constructionGoodyearStream Data CentersSize not stated
- Project EagleApprovedGlendaleTakanock LLCSize not stated
- SpaceX data center campus near Willcox PlayaAnnouncedTown not statedSpaceX6 GW
- Confidential Mission Critical Data CenterUnknownMesaDeveloper not named350 MW
Get every active project in Arizona.
Tell us what you sell. You get the approved and under-construction projects in Arizona and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.