Sovereign Gazelle bitcoin mining facility
Data center project in Somerville, Alabama
Sovereign Gazelle bitcoin mining facility is a data center project in Somerville, Alabama, blocked or paused, developed by Sovereign Gazelle, with a stated size of 50 MW. Last reported June 23, 2026, from 1 source.
- Status
- Blocked or paused
- Developer
- Sovereign Gazelle
- Location
- Somerville, Alabama
- Stated size
- 50 MW
- Last reported
- June 23, 2026
- Sources
- 1 source
- Other companies on the job
- None named yet
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“a bitcoin mining facility proposed near Somerville”
Status
“The Morgan County Commission approved a 12-month moratorium on data centers Tuesday, aiming to block a bitcoin mining facility proposed near Somerville.”
Size
“75-foot utility poles for 50-megawatt power lines”
Reports behind this page
- Data Centers: Daily Notes | June 24, 2026 · writing.strisker.com, June 23, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partnersEvery company the sources name on this job as they are found, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Alabama
- Bessemer Hyperscale Data CenterApprovedBessemerQTS Data Centers1.2 GW
- Nebius Birmingham AI FactoryUnder constructionBirminghamNebius300 MW
- Delta Forge 2Under constructionBrookwoodApplied Digital210 MW
- Delta Forge 2 AI data centerUnder constructionBrookwoodApplied Digital210 MW
- Meta Platforms MontgomeryUnder constructionMontgomeryMeta153 MW
- Digi Power X Alabama AI data centerUnder constructionColumbianaDigi Power X Inc.40 MW
Get every active project in Alabama.
Tell us what you sell. You get the approved and under-construction projects in Alabama and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.